Driving Efficient Movement
For this project, EHRA Engineering prepared construction documents for the South Cane Island Parkway from south of I-10 through proposed Cane Island Parkway and FM 1463 intersection. The new roadway design comprises of one-half major thoroughfare, conventional drainage, a 600-ft long bridge over Willow Fork Bayou, retaining walls and intersection improvements at FM 1463 (including traffic signals and illumination). The roadway section consists of a two-lane 25-foot concrete pavement roadway.
The intersection at FM 1463 will facilitate the traffic flow between the proposed two-lane South Cane Island Parkway and the existing FM 1463. EHRA has been in contact with TxDOT throughout the design phase of the project. This project required TxDOT permit since the proposed roadway ties to TxDOT on facilities on both ends. It also required coordination with TxDOT regarding the traffic signal modification for future roadway widening. Traffic Control Plans are developed for the construction of new intersection at FM 1463.
This project will be unique because of the many entities involved, some of which include: Fort Bend County, TxDOT, Fort Bend County Drainage District, numerous pipeline companies, Centerpoint Energy, and adjacent land owners, constant coordination will be needed to be successful.
Sivaji Senapathi, Practice Area Leader - Traffic & Transportation
Designed to Be Durable
The bridge over the Willow Fork Bayou is designed using standard type TX46 pre-stressed concrete girders supported on standard abutments and interior bents supported on drilled shaft foundations. The bridge is designed per TxDOT Bridge Design Guidelines and Standards. Design loading is per AASHTO LRFD Design Specifications, current edition. The scour depths were calculated using FHWA guidelines.
Set for Future Growth
The project includes a detailed hydraulic impact analysis for the proposed Cane Island Parkway and FM 1463 intersection, which has been performed in accordance with the Fort Bend Drainage District design criteria. Analysis includes coordination with TxDOT to discuss design options for draining the proposed intersection, such that it will correspond with the future TxDOT road widening project of FM 1463.
EHRA has provided professional surveying services to perform calculations of the final approved alignment for the route and prepare documents for the acquisition of land for the road.
This project requires coordination with Kinder Morgan and Enterprise pipeline companies and CenterPoint Energy.
EHRA is a great firm, communicate very well and always deliver the job in a timely manner while addressing our needs.
Robert Pechukas, Manager of Policy and Administration at Fort Bend County
Improving Value for the Community
As a popular master-planned community in Katy, Cane Island needs reliable, smartly designed pathways that allow residents and visitors to navigate the community and surrounding retail areas with ease.
EHRA's improvements to Cane Island have given the area the resources it needs to provide dedicated transportation routes and the opportunity for future growth as the community continues to expand.
-
ON TIME
-
UNDER BUDGET
-
WITH EXPERTISE
Explore Our Latest News
Put the Pieces Together
Project InFocus: NWHCMUD 6 – Waterline Rehabilitation Phase I
Project InFocus: Brookewater
INTERESTED IN WORKING WITH
EHRA ENGINEERING?
We bring our professionalism and expertise to every project we undertake. Want to experience the difference that comes when creativity and passion collide? Review our resources for more information or reach out to us today.