Cane Island PARKWAY

The scope of the project included one-half major thoroughfare, convention drainage, a 600-ft bridge over Willow Fork of Buffalo Bayou, retaining walls and intersection improvements at FM 1463 including traffic signals.

Project Overview

Driving Efficient Movement

For this project, EHRA Engineering prepared construction documents for the South Cane Island Parkway from south of I-10 through proposed Cane Island Parkway and FM 1463 intersection.  The new roadway design comprises of one-half major thoroughfare, conventional drainage, a 600-ft long bridge over Willow Fork Bayou, retaining walls and intersection improvements at FM 1463 (including traffic signals and illumination).  The roadway section consists of a two-lane 25-foot concrete pavement roadway. 

The intersection at FM 1463 will facilitate the traffic flow between the proposed two-lane South Cane Island Parkway and the existing FM 1463. EHRA has been in contact with TxDOT throughout the design phase of the project. This project required TxDOT permit since the proposed roadway ties to TxDOT on facilities on both ends. It also required coordination with TxDOT regarding the traffic signal modification for future roadway widening. Traffic Control Plans are developed for the construction of new intersection at FM 1463.

 

This project will be unique because of the many entities involved, some of which include: Fort Bend County, TxDOT, Fort Bend County Drainage District, numerous pipeline companies, Centerpoint Energy, and adjacent land owners, constant coordination will be needed to be successful.

Sivaji Senapathi, Practice Area Leader - Traffic & Transportation
Project Details

Designed to Be Durable

The bridge over the Willow Fork Bayou is designed using standard type TX46 pre-stressed concrete girders supported on standard abutments and interior bents supported on drilled shaft foundations.  The bridge is designed per TxDOT Bridge Design Guidelines and Standards. Design loading is per AASHTO LRFD Design Specifications, current edition. The scour depths were calculated using FHWA guidelines.

Cane Island Parkway
This route has seen tremendous traffic since it opened - demonstrating its huge value to the community and to the retail growth that has come into the corridor with the opening of the Buc-ee’s location on the north side of the interstate.
Project Approach

Set for Future Growth

The project includes a detailed hydraulic impact analysis for the proposed Cane Island Parkway and FM 1463 intersection, which has been performed in accordance with the Fort Bend Drainage District design criteria. Analysis includes coordination with TxDOT to discuss design options for draining the proposed intersection, such that it will correspond with the future TxDOT road widening project of FM 1463.

EHRA has provided professional surveying services to perform calculations of the final approved alignment for the route and prepare documents for the acquisition of land for the road.

This project requires coordination with Kinder Morgan and Enterprise pipeline companies and CenterPoint Energy.


EHRA is a great firm, communicate very well and always deliver the job in a timely manner while addressing our needs.

Robert Pechukas, Manager of Policy and Administration at Fort Bend County
Project Details
Construction Phase Services
Hydrology and Hydraulics
Structures
Project Outcome

Improving Value for the Community

As a popular master-planned community in Katy, Cane Island needs reliable, smartly designed pathways that allow residents and visitors to navigate the community and surrounding retail areas with ease. 

EHRA's improvements to Cane Island have given the area the resources it needs to provide dedicated transportation routes and the opportunity for future growth as the community continues to expand.

  • ON TIME
  • UNDER BUDGET
  • WITH EXPERTISE

Explore Our Latest News

30 Oct 2024

Put the Pieces Together

Growing up, I always knew I wanted to be an engineer. I was fascinated by building things—whether it was Rubik’s Cubes, Legos, puzzles, or...
30 Oct 2024

Project InFocus: NWHCMUD 6 – Waterline Rehabilitation Phase I

As the engineer for our Northwest Harris County Municipal Utility District (NWHCMUD) No. 6, one of our top priorities is the health and...
30 Sep 2024

Project InFocus: Brookewater

Brookewater, located on an 866-acre tract in Beasley, TX, is an exciting new addition in large-scale community design and urban planning....

INTERESTED IN WORKING WITH
EHRA ENGINEERING?

We bring our professionalism and expertise to every project we undertake. Want to experience the difference that comes when creativity and passion collide? Review our resources for more information or reach out to us today.