HCMUD No. 536 Wastewater Treatment Plant

The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.

 
HCMUD-536-waste-water-facility
Project Overview

Harris County MUD No. 536 Wastewater Treatment Plant & On-Site Lift Station Expansion

The objective of this project was to design and construct and a standard steel package plant and  an onsite lift station to meet the District’s interim needs. The steel package plant consists of 52-foot tanks, each 12 feet wide and 12 feet, 2 inches high. The facility features an activated sludge process system with nitrification which incorporates two aeration basins, one aerobic digester, a 42-ft-diameter final clarifier, and a 25-ft-long chlorine contact basin. The final clarifier and chlorine contact basin are oversized to accommodate future plant expansion. Additionally, the facility is equipped with an emergency standby diesel generator.

The wastewater treatment plant site required a dedicated storm water quality feature and a Stormwater Pollution Prevention Plan (SWPPP) not originally included in the master drainage plan. The site contained diminutive impervious area and therefore very little runoff was anticipated. Given this projection, engineered swales were sufficient to meet the storm water quality feature prerequisite. The EHRA team also recommended several thick grass species that are bulky enough to filter storm water and decrease the speed of high velocity runoff.    

During the permitting process, the Texas Commission on Environmental Quality notified EHRA that the receiving stream would have the most stringent discharge parameters. EHRA addressed this condition by selecting a tertiary cloth filter package installation that not only met the discharge requirements, but also provided Type 1 Effluent. This effluent type is ideal in the event that the District decides to use treated effluent for irrigation of public areas in the future.

Project Details
Facilities

SEE EHRA’S LATEST NEWS

24 Apr 2024

Keeping the Path

Having been born here in Houston, Texas, I will forever have a love, dedication and commitment to what I consider at heart “my city.” I am...
24 Apr 2024

Project InFocus: Harris County MUD 449 Ventana Lakes East Trails

Project Overview Harris County MUD 449 sought to add recreational diversity to their park system in 2022. EHRA landscape architects, in...
21 Mar 2024

Embracing the Unexpected

Growing up in Sugarland, Texas, life was a challenging yet transformative journey for me. Raised by a hardworking mother who worked...

INTERESTED IN WORKING WITH
EHRA ENGINEERING?

We bring our professionalism and expertise to every project we undertake. Want to experience the difference that comes when creativity and passion collide? Review our resources for more information or reach out to us today.