Northpark Drive Mobility Project

EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Drive

 
Project Overview

Designs to Enhance Traffic Flow

EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing.

EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements.

Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.

As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.

Project Details
Hydrology and Hydraulics
Public Infrastructure
Structures

SEE EHRA’S LATEST NEWS

27 Feb 2025

Whoop, Jim Russ!

EHRA Engineering is proud to celebrate a monumental achievement for our President & CEO, Jim Russ, who has been recognized with two of the...
27 Feb 2025

Project InFocus: Sugar Land Trails Pedestrian Bridges

EHRA Engineering is proud to have partnered with the City of Sugar Land (COSL) to enhance the City's shared-use path (SUP) trail system,...
26 Feb 2025

EHRA Engineering Welcomes New Shareholders

EHRA Engineering is proud to announce the addition of two distinguished professionals to its ownership group—Paul Anderson, PE and Camaaron...

INTERESTED IN WORKING WITH
EHRA ENGINEERING?

We bring our professionalism and expertise to every project we undertake. Want to experience the difference that comes when creativity and passion collide? Review our resources for more information or reach out to us today.