Ventana Lakes Development

Project totaled 640 acres including 1256 Residential Lots. EHRA designed, created construction plans, publicly bid and preformed Construction management.

 
ventana-lakes-development
Project Overview

EHRA designed planned and performed construction management.

Project totaled 640 acres and is boarded by Clay, Peek, Stockdick School and Porter Road. EHRA designed, created construction plans, publicly bid and preformed Construction management for  roadways, water distribution , sanitary sewer, Storm Sewer Collection, Mass grading, Detention, Drainage channel and Pad/Lot Grading for the 640 acres. The 640 acres includes 1256 Single Family Residential Lots, a 120 acre KISD school campus (Elementary, Middle and High school) , and 2 commercial sites totaling 23 acres.  The project consisted of  15 subdivision sections averaging 82 lots per section, (5) detention basins (approx 60 acres total), 2.2 mile collector roadway (4 phases) , a 1 mile long drainage channel ( 2 phases) , (1) water plant, (1) 0.64 mgd WWTP (3 -phases),  Lift station, Roadway expansions on existing major thoroughfare (Left Turn Lanes), Traffic Signal on Clay and Peek Road, Emergency Water Interconnect,  Traffic Impact Analysis, LOMR F and Detention Drainage Analysis. EHRA was and still is the HCMUD 449 District Engineer.  All 640 acres had no major issues during Harvey. 

Coordination and approvals were ongoing throughout the project  from the following entitys; City of Houston, Harris County Engineering Department, Harris County Precinct 3, KISD,  TCEQ, HCFCD, HCMUD 449, HCMUD 536, Kinder Morgan Pipeline, Exxon Pipeline, Enterprise Pipeline, CenterPoint Energy, Consolidated Communications and AT&T. 



Ventana Lakes Development

EHRA designed, created construction plans, publicly bid and preformed Construction management for  roadways, water distribution , sanitary sewer, Storm Sewer Collection, Mass grading, Detention, Drainage channel and Pad/Lot Grading for the 640 acres.

Ventana Lakes Development

EHRA designed, created construction plans, publicly bid and preformed Construction management for  roadways, water distribution , sanitary sewer, Storm Sewer Collection, Mass grading, Detention, Drainage channel and Pad/Lot Grading for the 640 acres.

Ventana Lakes Development

EHRA designed, created construction plans, publicly bid and preformed Construction management for  roadways, water distribution , sanitary sewer, Storm Sewer Collection, Mass grading, Detention, Drainage channel and Pad/Lot Grading for the 640 acres.

Project Details
Construction Phase Services
District Services
Facilities
Hydrology and Hydraulics
Land Services
Landscape Architecture
Planning and Visioning
Public Infrastructure
Site Development
Structures
Surveying and Mapping

SEE EHRA’S LATEST NEWS

21 Mar 2024

Embracing the Unexpected

Growing up in Sugarland, Texas, life was a challenging yet transformative journey for me. Raised by a hardworking mother who worked...
21 Mar 2024

Project InFocus: Weiser Business Park

EHRA Engineering has been at the forefront of the surveying industry since its inception in 1936. With a focus on diverse projects ranging...
29 Feb 2024

Project InFocus: Pedestrian Bridges Foundation Design & Inspection for the HLSR

It’s the most wonderful time of the year in Houston, where cowboy boots and carnival rides signal the arrival of one of the most iconic...

INTERESTED IN WORKING WITH
EHRA ENGINEERING?

We bring our professionalism and expertise to every project we undertake. Want to experience the difference that comes when creativity and passion collide? Review our resources for more information or reach out to us today.