logo
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Phase Services (CPS)
    • District Services
    • Facilities
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500
Menu
logo
713.784.4500

Northpark Drive Mobility Project

EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing. 

EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements. 

Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.  

As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.

View Project

Meridiana

The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge and providing access to the newly developed Meridiana Development. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project.  The main design challenge for this project was to accommodate double intersections on the west side of SH 288 to tie into existing access roads with two-way traffic and a new southbound on-ramp within a close proximity.  EHRA coordinated with TxDOT throughout the project from preliminary concepts for the intersection and bridge through final design and construction.  Each component of this project was designed in accordance with TxDOT standards and criteria.

View Project

Peoples Road

EHRA conducted a traffic engineering study to identify the impacts of a proposed master development located near the intersection of FM 1488 and Peoples Road in the City of Conroe.

View Project

Harris County MUD 500 Horsepen Creek Regional Lift Station

EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.

View Project

Jacobs Reserve Development

Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.

View Project
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Phase Services (CPS)
    • District Services
    • Facilities
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500

Krystal Regner, P.E., ENV SP

Filter By Practice Area
  • Awards
  • CONSTRUCTION PHASE SERVICES
  • DISTRICT SERVICES
  • FACILITIES
  • HYDROLOGY & HYDRAULICS
  • LAND SERVICES
  • LANDSCAPE ARCHITECTURE
  • MARKETING
  • PLANNING & VISIONING
  • PODCAST: The Ground Down
  • Project In Focus
  • PUBLIC WORKS
  • SHAREHOLDER ANNOUNCEMENT
  • SITE DEVELOPMENT
  • STRUCTURES
  • SURVEY & MAPPING SERVICES
  • Thought Leadership
  • TRAFFIC & TRANSPORTATION
Sort
  • Ascending
  • Descending
filter-icon
FACILITIES Thought Leadership
21 Nov 2022

Todays Young Engineers Tomorrows Industry Leaders

Civil Engineering is a broad field of work that supports a variety of industries. The seemingly endless opportunity is what initially drew me to...
Read More
EHRA_Logo_with_Tagline_Horizontal_White

Locations
© 2025 EHRA