Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
A 720-acre gated master planned community located off Telge Road, just north of Willow Creek. See how EHRA was involved in this project.
The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
Facilities requiring expansion were also common wall construction, and the EHRA team converted the facilities into aerobic digesters and sludge thickeners.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
In this episode EHRA Engineering’s Jim Russ talks to Caldwell Companies Executive Vice President and Partner, Peter Barnhart and founding Partner of the Muller Law Group, Rich Muller. Peter and Rich hit on several topics including how the COVID-19 Pandemic will effect land development and Municipal Utility Districts (MUDs).
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Youtube: https://youtu.be/GLkFT-bDdMQ
Spotify: https://open.spotify.com/episode/3ZbPe3HqkMoVK9eV07thnp
Pocketcasts: https://pca.st/i0jnjul2
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!7dcc3#t=1
