EHRA performed preliminary drainage area delineations for nine creek crossings and calculated approximate 100-year flows for each culvert crossing. Culvert structures were sized for each of the six crossings, ranging from 48” round pipe culverts up to dual 5’x5’ box culverts.
Project totaled 640 acres including 1256 Residential Lots. EHRA designed, created construction plans, publicly bid and preformed Construction management.
EHRA conducted a traffic engineering study to identify the impacts of a proposed master development located near the intersection of FM 1488 and Peoples Road in the City of Conroe.
EHRA offered its Landscape Architectural services to complete a Parks and Trails Master Plan for the District.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
In this episode EHRA Engineering’s Jim Russ talks to Caldwell Companies Executive Vice President and Partner, Peter Barnhart and founding Partner of the Muller Law Group, Rich Muller. Peter and Rich hit on several topics including how the COVID-19 Pandemic will effect land development and Municipal Utility Districts (MUDs).
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Youtube: https://youtu.be/GLkFT-bDdMQ
Spotify: https://open.spotify.com/episode/3ZbPe3HqkMoVK9eV07thnp
Pocketcasts: https://pca.st/i0jnjul2
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!7dcc3#t=1