

This project was the second phase of parks implementation outlined in the District's Parks Master Plan, which was completed by EHRA in 2007. Utilizing the site of a recently demolished former wastewater treatment plant provided an opportunity to create a passive park space for District residents.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project.
The new roadway design comprises of one-half major thoroughfare, conventional drainage, a 600-ft long bridge over Willow Fork Bayou, Retaining walls and intersection improvements at FM 1463 (including traffic signals and illumination).
EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.
In this episode EHRA Engineering’s Jim Russ talks to Caldwell Companies Executive Vice President and Partner, Peter Barnhart and founding Partner of the Muller Law Group, Rich Muller. Peter and Rich hit on several topics including how the COVID-19 Pandemic will effect land development and Municipal Utility Districts (MUDs).
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Youtube: https://youtu.be/GLkFT-bDdMQ
Spotify: https://open.spotify.com/episode/3ZbPe3HqkMoVK9eV07thnp
Pocketcasts: https://pca.st/i0jnjul2
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!7dcc3#t=1