The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge and providing access to the newly developed Meridiana Development. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project. The main design challenge for this project was to accommodate double intersections on the west side of SH 288 to tie into existing access roads with two-way traffic and a new southbound on-ramp within a close proximity. EHRA coordinated with TxDOT throughout the project from preliminary concepts for the intersection and bridge through final design and construction. Each component of this project was designed in accordance with TxDOT standards and criteria.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
In this episode EHRA Engineering’s Jim Russ talks to Caldwell Companies Executive Vice President and Partner, Peter Barnhart and founding Partner of the Muller Law Group, Rich Muller. Peter and Rich hit on several topics including how the COVID-19 Pandemic will effect land development and Municipal Utility Districts (MUDs).
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Youtube: https://youtu.be/GLkFT-bDdMQ
Spotify: https://open.spotify.com/episode/3ZbPe3HqkMoVK9eV07thnp