logo
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Aerial Survey Technologies
    • Construction Services
    • District Services
    • GIS Services
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Platting Services
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
    • Traffic Services
    • Transportation Services
    • Water & Wastewater Management
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500
Menu
logo
713.784.4500

Towne Lake

EHRA was selected by the client to provide engineering design and to serve as District Engineer for the 2,400 acre Towne Lake Development. Our survey department retraced the overall boundary and performed a topographic survey of the site.

View Project

Jacobs Reserve Development

Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.

View Project

Peoples Road

EHRA conducted a traffic engineering study to identify the impacts of a proposed master development located near the intersection of FM 1488 and Peoples Road in the City of Conroe.

View Project

West Road Phase 3 Landscape

EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements.  The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.

View Project

League Line

EHRA performed preliminary drainage area delineations for nine creek crossings and calculated approximate 100-year flows for each culvert crossing.  Culvert structures were sized for each of the six crossings, ranging from 48” round pipe culverts up to dual 5’x5’ box culverts.

View Project
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Aerial Survey Technologies
    • Construction Services
    • District Services
    • GIS Services
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Platting Services
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
    • Traffic Services
    • Transportation Services
    • Water & Wastewater Management
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500

J.T. Gaden, P.E.

Filter By Practice Area
  • Awards
  • CONSTRUCTION PHASE SERVICES
  • DISTRICT SERVICES
  • FACILITIES
  • HYDROLOGY & HYDRAULICS
  • LAND SERVICES
  • LANDSCAPE ARCHITECTURE
  • MARKETING
  • PLANNING & VISIONING
  • PODCAST: The Ground Down
  • Project In Focus
  • PUBLIC WORKS
  • SHAREHOLDER ANNOUNCEMENT
  • SITE DEVELOPMENT
  • STRUCTURES
  • SURVEY & MAPPING SERVICES
  • Thought Leadership
  • TRAFFIC & TRANSPORTATION
Sort
  • Ascending
  • Descending
filter-icon
LAND SERVICES Thought Leadership
31 Aug 2022

Learning, Teaching, Growing

Many people go through life knowing exactly what they want to be when they grow up. For people like me, the path for the future is paved one stage of...
Read More
EHRA_Logo_with_Tagline_Horizontal_White

Locations Privacy Policy
© 2026 EHRA