logo
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Services
    • District Services
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
    • Traffic Services
    • Transportation
    • Water & Wastewater Management
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500
Menu
logo
713.784.4500

West Road Phase 2 Sidewalk

EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements.  The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.

View Project

Houston Community College Campus Expansion

EHRA was selected as one of two firms to provide professional surveying services under contract to Houston Community College System.

View Project

Northpark Drive Mobility Project

EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing. 

EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements. 

Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.  

As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.

View Project

North Canal Diversion HCFCD Project

On-going surveying for property acquisition and engineering design surveys of re-routing of Buffalo Bayou north of downtown Houston between North Main Street and McKee Street. Services to be provided include “soundings” for Buffalo and White Oak Bayous.

View Project

League Line

EHRA performed preliminary drainage area delineations for nine creek crossings and calculated approximate 100-year flows for each culvert crossing.  Culvert structures were sized for each of the six crossings, ranging from 48” round pipe culverts up to dual 5’x5’ box culverts.

View Project
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Services
    • District Services
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
    • Traffic Services
    • Transportation
    • Water & Wastewater Management
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500

J.T. Gaden, P.E.

Filter By Practice Area
  • Awards
  • CONSTRUCTION PHASE SERVICES
  • DISTRICT SERVICES
  • FACILITIES
  • HYDROLOGY & HYDRAULICS
  • LAND SERVICES
  • LANDSCAPE ARCHITECTURE
  • MARKETING
  • PLANNING & VISIONING
  • PODCAST: The Ground Down
  • Project In Focus
  • PUBLIC WORKS
  • SHAREHOLDER ANNOUNCEMENT
  • SITE DEVELOPMENT
  • STRUCTURES
  • SURVEY & MAPPING SERVICES
  • Thought Leadership
  • TRAFFIC & TRANSPORTATION
Sort
  • Ascending
  • Descending
filter-icon
LAND SERVICES Thought Leadership
31 Aug 2022

Learning, Teaching, Growing

Many people go through life knowing exactly what they want to be when they grow up. For people like me, the path for the future is paved one stage of...
Read More
EHRA_Logo_with_Tagline_Horizontal_White

Locations
© 2025 EHRA