logo
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Services
    • District Services
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
    • Traffic Services
    • Transportation
    • Water & Wastewater Management
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500
Menu
logo
713.784.4500

Houston Community College Campus Expansion

EHRA was selected as one of two firms to provide professional surveying services under contract to Houston Community College System.

View Project

Peoples Road

EHRA conducted a traffic engineering study to identify the impacts of a proposed master development located near the intersection of FM 1488 and Peoples Road in the City of Conroe.

View Project

288 & CR56

The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project.

View Project

Ventana Lakes Development

Project totaled 640 acres including 1256 Residential Lots. EHRA designed, created construction plans, publicly bid and preformed Construction management.

View Project

Northpark Drive Mobility Project

EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing. 

EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements. 

Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.  

As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.

View Project
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Services
    • District Services
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
    • Traffic Services
    • Transportation
    • Water & Wastewater Management
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500

J.T. Gaden, P.E.

Filter By Practice Area
  • Awards
  • CONSTRUCTION PHASE SERVICES
  • DISTRICT SERVICES
  • FACILITIES
  • HYDROLOGY & HYDRAULICS
  • LAND SERVICES
  • LANDSCAPE ARCHITECTURE
  • MARKETING
  • PLANNING & VISIONING
  • PODCAST: The Ground Down
  • Project In Focus
  • PUBLIC WORKS
  • SHAREHOLDER ANNOUNCEMENT
  • SITE DEVELOPMENT
  • STRUCTURES
  • SURVEY & MAPPING SERVICES
  • Thought Leadership
  • TRAFFIC & TRANSPORTATION
Sort
  • Ascending
  • Descending
filter-icon
LAND SERVICES Thought Leadership
31 Aug 2022

Learning, Teaching, Growing

Many people go through life knowing exactly what they want to be when they grow up. For people like me, the path for the future is paved one stage of...
Read More
EHRA_Logo_with_Tagline_Horizontal_White

Locations
© 2025 EHRA