logo
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Phase Services (CPS)
    • District Services
    • Facilities
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500
Menu
logo
713.784.4500

League Line

EHRA performed preliminary drainage area delineations for nine creek crossings and calculated approximate 100-year flows for each culvert crossing.  Culvert structures were sized for each of the six crossings, ranging from 48” round pipe culverts up to dual 5’x5’ box culverts.

View Project

North Canal Diversion HCFCD Project

On-going surveying for property acquisition and engineering design surveys of re-routing of Buffalo Bayou north of downtown Houston between North Main Street and McKee Street. Services to be provided include “soundings” for Buffalo and White Oak Bayous.

View Project

Jacobs Reserve Development

Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.

View Project

West Road Phase 2 Sidewalk

EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements.  The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.

View Project

Towne Lake

In 2006, Caldwell Companies sought to create Towne Lake as a community where residents and services could be connected by water. Their vision included boat docks and marinas augmenting traditional walking trails to navigate a vibrant residential community. EHRA was the perfect partner to take Caldwell Companies’ vision and create this livable suburban oasis.

View Project
  • About Us
    • Company
    • Leadership
    • Our Legacy
    • Guiding Principles
    • Awards
    • Resources
  • Project Profiles
  • Services
    • Construction Phase Services (CPS)
    • District Services
    • Facilities
    • Hydrology & Hydraulics (H&H)
    • Land Services
    • Landscape Architecture
    • Planning & Visioning
    • Public Infrastructure
    • Site Development
    • Structures
    • Surveying & Mapping
  • Resources
    • Media Kit
    • News
    • Publications
    • Bid Info
    • Make A Payment
  • Contact Us
  • Careers
713.784.4500

John J. Ivery Jr. P.E. ENV SP CDT Associate Senior Project Manager

Filter By Practice Area
  • Awards
  • CONSTRUCTION PHASE SERVICES
  • DISTRICT SERVICES
  • FACILITIES
  • HYDROLOGY & HYDRAULICS
  • LAND SERVICES
  • LANDSCAPE ARCHITECTURE
  • MARKETING
  • PLANNING & VISIONING
  • PODCAST: The Ground Down
  • Project In Focus
  • PUBLIC WORKS
  • SHAREHOLDER ANNOUNCEMENT
  • SITE DEVELOPMENT
  • STRUCTURES
  • SURVEY & MAPPING SERVICES
  • Thought Leadership
  • TRAFFIC & TRANSPORTATION
Sort
  • Ascending
  • Descending
filter-icon
PUBLIC WORKS Project In Focus
8 Apr 2021

Sjolander Road Widening and Bioswale

EHRA Engineering uses the Low Impact Development (LID) land planning and engineering design approach to manage stormwater runoff as part of...
Read More
EHRA_Logo_with_Tagline_Horizontal_White

Locations
© 2025 EHRA