EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.
EHRA completed a site-specific planning and visioning study for the proposed 470-acre San Jacinto Boulevard District (SJBD) in Baytown, Texas.
EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing.
EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements.
Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.
As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.
The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge and providing access to the newly developed Meridiana Development. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project. The main design challenge for this project was to accommodate double intersections on the west side of SH 288 to tie into existing access roads with two-way traffic and a new southbound on-ramp within a close proximity. EHRA coordinated with TxDOT throughout the project from preliminary concepts for the intersection and bridge through final design and construction. Each component of this project was designed in accordance with TxDOT standards and criteria.
EHRA was selected as one of two firms to provide professional surveying services under contract to Houston Community College System.
EHRA Construction Phase Services finished a 12-month review of construction prices for common civil infrastructure items. The results continue to show steady price increases for items where construction materials are in limited supply. Most recently, concrete products, which remained steady last year, are now showing notable price increases as well. We understand that the concrete price increase is both due to global cement supply challenges and local product shipping / delivery costs.
We have observed a steady trend of price increases for various water distribution items.
Pricing since Q1 of 2021.
Over the last 12 months, we have observed a varying price increase for
wastewater collection items.
Pricing since Q1 of 2021.
EHRA noted moderate price increase for the previous 12 months on drainage infrastructure.

Pricing since Q1 of 2021.
Prices for concrete paving were steady through most of 2021.

Pricing since Q1 of 2021.
Stay tuned to EHRA for the latest trends in construction pricing and contact your EHRA project manager for an analysis of your projects.
EHRA is grateful to our longstanding clients as well as our new clients. Thank you for trusting us with your projects, big and small. 2022 is shaping up like another remarkable year. Years from now we will look back at these extraordinary times and be able to tell our children and the next generation of land developers not to discount the effects of globalization!