The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge and providing access to the newly developed Meridiana Development. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project. The main design challenge for this project was to accommodate double intersections on the west side of SH 288 to tie into existing access roads with two-way traffic and a new southbound on-ramp within a close proximity. EHRA coordinated with TxDOT throughout the project from preliminary concepts for the intersection and bridge through final design and construction. Each component of this project was designed in accordance with TxDOT standards and criteria.
EHRA offered its Landscape Architectural services to complete a Parks and Trails Master Plan for the District.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
The new roadway design comprises of one-half major thoroughfare, conventional drainage, a 600-ft long bridge over Willow Fork Bayou, Retaining walls and intersection improvements at FM 1463 (including traffic signals and illumination).
EHRA assisted with the district creation of Montgomery County Municipal Utility District No. 126 to accommodate a ±329 acre master planned community located in northern Montgomery County in the City of Conroe, south of League Line Road, west of Longmire Road, and adjacent to Lake Conroe.
Touching base with our Clients & Friends...
All of us at EHRA Engineering hope you and your families are safe, healthy and faring well during these unsettled and unprecedented times. With changes happening almost daily, we wanted to reach out to let you know that the EHRA Team remains strong, healthy and ready to assist. EHRA Engineering has thrived through economic highs and lows throughout our eight plus decades of serving the Greater Houston Region. With so many unknowns out there today, and with so much unrest, please always remember that we are here for you; our Clients, Districts, Counties, Cities and the Communities we love and serve.
We are proud to be a Houston COVID-19 Work Safe Company, and we are continuing to conduct our daily business activities remotely. The health, safety and well-being of our Team Members and Clients remains our absolute highest priority. As such, we are continuing to observe the Stay Home – Work Safe Order through April 30th. Our Work from Home program is in full action and allows us to continue meeting and exceeding the needs and expectations of our Clients without disruption. Our goal is to deliver your projects with no interruption to your project needs, schedules and budgets.
Let’s stay connected. Please reach out to me at any time if I, or any member of the EHRA Engineering Team, can be of service to you in any capacity. I can be reached by email at jruss@ehrainc.com or at our office at 713.784.4500.
Sincerely,

Jim Russ
President & CEO
