

The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
Touching base with our Clients & Friends...
All of us at EHRA Engineering hope you and your families are safe, healthy and faring well during these unsettled and unprecedented times. With changes happening almost daily, we wanted to reach out to let you know that the EHRA Team remains strong, healthy and ready to assist. EHRA Engineering has thrived through economic highs and lows throughout our eight plus decades of serving the Greater Houston Region. With so many unknowns out there today, and with so much unrest, please always remember that we are here for you; our Clients, Districts, Counties, Cities and the Communities we love and serve.
We are proud to be a Houston COVID-19 Work Safe Company, and we are continuing to conduct our daily business activities remotely. The health, safety and well-being of our Team Members and Clients remains our absolute highest priority. As such, we are continuing to observe the Stay Home – Work Safe Order through April 30th. Our Work from Home program is in full action and allows us to continue meeting and exceeding the needs and expectations of our Clients without disruption. Our goal is to deliver your projects with no interruption to your project needs, schedules and budgets.
Let’s stay connected. Please reach out to me at any time if I, or any member of the EHRA Engineering Team, can be of service to you in any capacity. I can be reached by email at jruss@ehrainc.com or at our office at 713.784.4500.
Sincerely,
Jim Russ
President & CEO