Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
EHRA performed preliminary drainage area delineations for nine creek crossings and calculated approximate 100-year flows for each culvert crossing. Culvert structures were sized for each of the six crossings, ranging from 48” round pipe culverts up to dual 5’x5’ box culverts.
EHRA offered its Landscape Architectural services to complete a Parks and Trails Master Plan for the District.
Touching base with our Clients & Friends...
All of us at EHRA Engineering hope you and your families are safe, healthy and faring well during these unsettled and unprecedented times. With changes happening almost daily, we wanted to reach out to let you know that the EHRA Team remains strong, healthy and ready to assist. EHRA Engineering has thrived through economic highs and lows throughout our eight plus decades of serving the Greater Houston Region. With so many unknowns out there today, and with so much unrest, please always remember that we are here for you; our Clients, Districts, Counties, Cities and the Communities we love and serve.
We are proud to be a Houston COVID-19 Work Safe Company, and we are continuing to conduct our daily business activities remotely. The health, safety and well-being of our Team Members and Clients remains our absolute highest priority. As such, we are continuing to observe the Stay Home – Work Safe Order through April 30th. Our Work from Home program is in full action and allows us to continue meeting and exceeding the needs and expectations of our Clients without disruption. Our goal is to deliver your projects with no interruption to your project needs, schedules and budgets.
Let’s stay connected. Please reach out to me at any time if I, or any member of the EHRA Engineering Team, can be of service to you in any capacity. I can be reached by email at jruss@ehrainc.com or at our office at 713.784.4500.
Sincerely,
Jim Russ
President & CEO