Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.
EHRA was selected as one of two firms to provide professional surveying services under contract to Houston Community College System.
EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing.
EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements.
Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.
As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.
The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge and providing access to the newly developed Meridiana Development. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project. The main design challenge for this project was to accommodate double intersections on the west side of SH 288 to tie into existing access roads with two-way traffic and a new southbound on-ramp within a close proximity. EHRA coordinated with TxDOT throughout the project from preliminary concepts for the intersection and bridge through final design and construction. Each component of this project was designed in accordance with TxDOT standards and criteria.
When Joseph Hyman , mechanical engineering, was a student at UMBC, he was sitting in the library craving a fresh, hot cup of coffee, when an idea struck him: Wouldn't it be great if a travel mug could brew its own coffee?
When he searched for this mug of his dreams and couldn't find anyone manufacturing something similar, he decided to create it himself. After graduating he pulled together a talented team of fellow UMBC engineering students and alumni and got started on the design and the business model to make it a reality.
Fast forward more than four years, and the combined travel mug and coffee brewer that Hyman envisioned has become the first product of the MoJoe Brewing Co., backed by more than 700 supporters of a Kickstarter campaign. The team sought $20,000 through crowdfunding to jump-start production, and ended up with more than $85,000 in pledges.
Hyman collaborated with Ezekial Kolajo, mechanical engineering, who he has known for more than 15 years, and Jingrui Wang , Ph.D., mechanical engineering, the teaching assistant for an electrical engineering course that Hyman took at UMBC, as well as Alexandre Wing to develop the personal mobile brewer for MoJoe.
One challenge they faced was developing and launching the company's first product while maintaining full-time jobs, which limited the time they had to focus on the new company. "It's exciting that after years of building a product, people actually want it. And that there's a demand for it," Hyman said. "It makes the sleepless nights worth it."
Kolajo, co-founder and engineer for MoJoe, says that the experience has taught him the importance of believing in himself and persevering when things get challenging. "It's been rather surreal to find ourselves in a position where an idea has come to life and is getting a lot of positive attention," he says. "I never imagined I would find myself in a position like this."
Although Hyman does not have any formal business education or a background in the industry, during his time at UMBC he had an opportunity to work with the Alex Brown Center for Entrepreneurship, which gave him the confidence that creating his own business was possible. He and Kolajo also credit their experience in the Meyerhoff Scholars Program with honing their collaboration skills and tenacity to succeed.
Hyman explains that it can be overwhelming for aspiring entrepreneurs to start a business or develop a product when they look only at the big picture and do not know exactly where to begin. He recommends examining each aspect of the new venture on its own, and working through challenges step by step to make steady progress.
Source: University of Maryland, Baltimore County.