The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
A 720-acre gated master planned community located off Telge Road, just north of Willow Creek. See how EHRA was involved in this project.
The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
In 2006, Caldwell Companies sought to create Towne Lake as a community where residents and services could be connected by water. Their vision included boat docks and marinas augmenting traditional walking trails to navigate a vibrant residential community. EHRA was the perfect partner to take Caldwell Companies’ vision and create this livable suburban oasis.
In this episode Waller County Judge Trey Duhon and Waller County Economic Development Partnership Executive Director Vince Yokom join EHRA Engineering's Jim Russ and Sivaji Senapathi, P.E. to discuss the impact of the COVID-19 crisis and the related challenges facing Waller County. Stay tuned to the entire episode as Vince reveals a BIG announcement for Waller County.
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Spotify: https://open.spotify.com/episode/3hZ4awr104VJUxHUsh1x9u
Youtube: https://www.youtube.com/watch?v=QwWWG8z1hXo&t=730s
Pocketcasts: https://pca.st/j5cl170s
Anchor: https://anchor.fm/the-ground-down/episodes/Catching-up-with-Waller-Count...
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!51450
