On-going surveying for property acquisition and engineering design surveys of re-routing of Buffalo Bayou north of downtown Houston between North Main Street and McKee Street. Services to be provided include “soundings” for Buffalo and White Oak Bayous.
EHRA completed a site-specific planning and visioning study for the proposed 470-acre San Jacinto Boulevard District (SJBD) in Baytown, Texas.
EHRA was selected by the client to provide engineering design and to serve as District Engineer for the 2,400 acre Towne Lake Development. Our survey department retraced the overall boundary and performed a topographic survey of the site.
Facilities requiring expansion were also common wall construction, and the EHRA team converted the facilities into aerobic digesters and sludge thickeners.
This project was the second phase of parks implementation outlined in the District's Parks Master Plan, which was completed by EHRA in 2007. Utilizing the site of a recently demolished former wastewater treatment plant provided an opportunity to create a passive park space for District residents.
In this episode Waller County Judge Trey Duhon and Waller County Economic Development Partnership Executive Director Vince Yokom join EHRA Engineering's Jim Russ and Sivaji Senapathi, P.E. to discuss the impact of the COVID-19 crisis and the related challenges facing Waller County. Stay tuned to the entire episode as Vince reveals a BIG announcement for Waller County.
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Spotify: https://open.spotify.com/episode/3hZ4awr104VJUxHUsh1x9u
Youtube: https://www.youtube.com/watch?v=QwWWG8z1hXo&t=730s
Pocketcasts: https://pca.st/j5cl170s
Anchor: https://anchor.fm/the-ground-down/episodes/Catching-up-with-Waller-Count...
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!51450
