

Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
EHRA conducted a traffic engineering study to identify the impacts of a proposed master development located near the intersection of FM 1488 and Peoples Road in the City of Conroe.
Facilities requiring expansion were also common wall construction, and the EHRA team converted the facilities into aerobic digesters and sludge thickeners.
EHRA was selected as one of two firms to provide professional surveying services under contract to Houston Community College System.
In this episode Waller County Judge Trey Duhon and Waller County Economic Development Partnership Executive Director Vince Yokom join EHRA Engineering's Jim Russ and Sivaji Senapathi, P.E. to discuss the impact of the COVID-19 crisis and the related challenges facing Waller County. Stay tuned to the entire episode as Vince reveals a BIG announcement for Waller County.
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Spotify: https://open.spotify.com/episode/3hZ4awr104VJUxHUsh1x9u
Youtube: https://www.youtube.com/watch?v=QwWWG8z1hXo&t=730s
Pocketcasts: https://pca.st/j5cl170s
Anchor: https://anchor.fm/the-ground-down/episodes/Catching-up-with-Waller-Count...
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!51450