Project totaled 640 acres including 1256 Residential Lots. EHRA designed, created construction plans, publicly bid and preformed Construction management.
EHRA designed an expansion that implemented the installation of a new triplex lift station operating in conjunction with the existing duplex lift station.
This project was the second phase of parks implementation outlined in the District's Parks Master Plan, which was completed by EHRA in 2007. Utilizing the site of a recently demolished former wastewater treatment plant provided an opportunity to create a passive park space for District residents.
The facility features an activated sludge process system. Additionally, the facility is equipped with an emergency standby diesel generator.
EHRA planners, hydrologists and landscape architects worked together to propose an alternative use for the space, re-developing the basin into an amenity pond. EHRA carefully selected native plant materials for both their ability to survive in the harsh conditions of the basin as well as providing filtration for improved storm water quality.
In this episode Waller County Judge Trey Duhon and Waller County Economic Development Partnership Executive Director Vince Yokom join EHRA Engineering's Jim Russ and Sivaji Senapathi, P.E. to discuss the impact of the COVID-19 crisis and the related challenges facing Waller County. Stay tuned to the entire episode as Vince reveals a BIG announcement for Waller County.
We have the Podcast posted across all channels. Please click one of the links below to listen or watch.
Spotify: https://open.spotify.com/episode/3hZ4awr104VJUxHUsh1x9u
Youtube: https://www.youtube.com/watch?v=QwWWG8z1hXo&t=730s
Pocketcasts: https://pca.st/j5cl170s
Anchor: https://anchor.fm/the-ground-down/episodes/Catching-up-with-Waller-Count...
Radio Public: https://radiopublic.com/the-ground-down-G70VoR/s1!51450
