Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
EHRA was selected as one of two firms to provide professional surveying services under contract to Houston Community College System.
Timber seems to be making a comeback in the construction world. Crews recently installed a cross-laminated timber deck for a 19,000-sq-ft McDonald’s restaurant in Chicago. The work marked the first use of CLT as a structural material in a Chicago commercial building and one of the most extensive uses of wood in a commercial building since the Great Chicago Fire of 1871.
Source: http://enr.com