EHRA was selected by the client to provide engineering design and to serve as District Engineer for the 2,400 acre Towne Lake Development. Our survey department retraced the overall boundary and performed a topographic survey of the site.
EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing.
EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements.
Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.
As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
In 2006, Caldwell Companies sought to create Towne Lake as a community where residents and services could be connected by water. Their vision included boat docks and marinas augmenting traditional walking trails to navigate a vibrant residential community. EHRA was the perfect partner to take Caldwell Companies’ vision and create this livable suburban oasis.
Engineering design and construction phase services of water, sewer, drainage and paving for four subdivision sections and off-site channel (123 acres out of a 400 acre subdivision). There was 60-feet of elevation difference on this site and wooded lots were left in their natural state which required the installation of retaining walls.
We can’t grow if we aren’t willing to learn, change and challenge ourselves. I’ve spent over half my career in another profession, as a teacher, but through moves and changes in the industry, I had to step away and challenge myself by learning something new. Sometimes we have no other choice but to push ourselves outside of our comfort zone in the name of growth.
Hard Work and Dedication
After seven years in education, being selected as my district’s Kansas Horizon Award nominee, earning Teacher of the Year honors in my first eligible year, achieving National Board Certification, obtaining two teaching degrees and navigating moves between two states, I thought I had a pretty clear picture of my career path. Once I moved to Texas, I began to feel my passion for teaching slipping away. With the challenges facing the education system and little indication that they would improve anytime soon, I wasn't sure how much longer I wanted to remain in the profession.
I decided to put myself and my skills out there and look for different opportunities. And the world stood to prove just how small it really is when, coincidentally, my sister’s brother-in-law, so happened to have recently discussed with Jackie Overton, EHRA Engineering’s current Assistant Director of Platting Services, the immediate need to expand the platting team. Once hearing about the opportunity I ambitiously filled out the application, submitted my resume and hoped for the best. I received the call for an interview, met with the team and that was the end of one chapter and the opening page to the next.
Jumping into the platting world and the civil engineering industry headfirst was no small task. I was starting from scratch in what felt like learning a completely new language. I found success through learning as I go and utilizing my years of teaching to become my own student to learn and grow. I have developed platting checklists and guidance documents to streamline the final plat process and improve consistency across our team. I also created jurisdictional timeline resources that have been shared with other service areas to help them better understand how the platting process aligns with and impacts their project schedules. Additionally, I developed the, "What Is Platting?" presentation as a part of EHRA's Slice of Knowledge series. The presentation has since been shared with interns and new hires as a training resource and includes examples of key documents frequently used throughout the platting process, such as tax certificates and mylars, to provide a practical understanding of the work we do.
My drive comes from being fully invested in the work I do, which is what enabled me to adapt quickly and grow within the platting profession. I am incredibly proud of our team’s accomplishments and motivated by the opportunities ahead. What began as a two-person team consisting of Jackie and me has grown into a team of six and an established standalone service area. The dedication and collaboration that made that growth possible are what make me most proud of the work we continue to do every day.
Last year we broke our previous year’s record for recorded plats per year, and we’re looking to keep that up every year moving forward. We will keep looking for more records to break and for more goals to achieve all as one team.
More Than the Work
Throughout my time here at EHRA, I have not only learned the ins and outs of platting, but I have also gotten the opportunity to learn about the industry as a whole, our many different services and all the moving parts this company has to offer. I have built meaningful relationships with team members across many different service areas and titles. Through these relationships I have been able to better help those I’m working with and in turn they have notably helped me. The team atmosphere here is like no other, and I’m happy to be just one part of the team.
Although I love teaching and I miss the kids and the classroom, ultimately, moving on was the best decision for me. Now I take my experience gained in the classroom and shape it into different forms to better establish efficiency and accuracy as we work through platting rules, regulations, tight timelines and continued challenges. While my journey in getting here was not like most, I am certain that this is the place I am meant to be.
