EHRA completed preliminary engineering, phase one environmental site assessment and schematic development for the widening of Northpark Dr. between US 59 and Woodland Hills Dr. EHRA also provided program management, drainage analysis and design, traffic engineering, environmental documentation and schematic design for the roadway, as well as grade separation at the Loop 494/UPRR railroad crossing.
EHRA conducted traffic operations and access management studies for the Northpark Dr. corridor. This corridor is approximately 2.2 miles long and has major signalized and unsignalized intersections and driveways that access various subdivisions and industrial developments. These studies laid the groundwork for the widening of Northpark Dr. from a four-lane boulevard cross-section to a six-lane boulevard complete street. The new street design includes low impact development drainage, conventional drainage, a grade separation at the UPRR crossing with mechanically stabilized earth retaining walls, two at-grade crossings for bi-directional frontage access, reconstruction of two concrete bridges over a diversion channel, intersection improvements, a roadway-adjacent multiuse path and traffic signal improvements.
Drainage analysis and design included hydrologic and hydraulic studies of both existing and proposed conditions to demonstrate that proposed project components would not adversely affect the 100-year floodplain in the area. The roadway and traffic designs contained horizontal and vertical alignments, cross-sections, plan and profile, sidewalk and bicycle accommodations, intersection layouts, traffic control plans and signing and pavement markings.
As the program management firm, EHRA coordinated with TxDOT, UPRR, the City of Houston Council District E, COH Planning and Development Department, COH Public Works and Engineering Department, Montgomery County, Harris County, HCFCD and area residents throughout the project.
EHRA worked with the District to create a comprehensive Parks Master Plan, which included recommendations for the development of over two miles of hike/bike trails adjacent to local streets, and within flood control and utility pipeline easements. The District began implementation of the Plan by prioritizing the beautification of West Road, a major arterial street that runs through the District.
The purpose of this project was to convert the existing at-grade crossing of Brazoria County Road 56 (CR 56) and State Highway 288 (SH 288) into a diamond interchange that includes a new overpass bridge. Coordination with TXDOT, area landowners, utility companies, and Brazoria County was integral in obtaining approval and acceptance of the project.
EHRA was selected by the client to provide engineering design and to serve as District Engineer for the 2,400 acre Towne Lake Development. Our survey department retraced the overall boundary and performed a topographic survey of the site.
Identified as a top priority during the development of the District’s Parks Master Plan, this portion of trail was the first phase of over two miles of planned trails to provide connectivity and recreation for District residents.
Houston's Best PRISM Awards once again brought the best and brightest of Houston's marketing and sales professionals together for a night of recognition and celebration. The event, organized by the Greater Houston Builders Association (GHBA), was held on Saturday, October 14th, 2023, under the theme "Moon Dreams - A Cosmic Celebration," an evening that captivated attendees and participants alike.
The PRISM Awards, which stand for Performance Results in Sales & Marketing, are considered one of the highest accolades in the home building, marketing and sales industry. They recognize exceptional achievements in over 100 diverse categories, spanning from People to Product and Promotion. This prestigious recognition is a testament to the dedication and innovation exhibited by companies and professionals within the Houston market.
One of the highlights of this year's PRISM Awards was EHRA Engineering's victory in the Television/Video Promotion of the Year – Associate category. Our award-winning entry was the invigorating Towne Lake Project Profile video, showcasing the remarkable aspects of the master-planned community. The video provided a comprehensive and visually stunning portrayal of the community’s unique features along with EHRA’s commitment to excellence and innovation and the collaborative success of our project partner, Caldwell Companies. Additionally, EHRA was also a finalist for Website of the Year – Associate category.
Watch the Towne Lake Project Profile video below:
The success of the award was made possible by the concerted efforts of EHRA’s marketing team comprised of Lindsey Woodard, Chris Butcher, Cassie Faber, Kassie Talley and Megan Haas. Their strategic vision and creativity played a pivotal role in effectively highlighting the exceptional attributes of the Towne Lake project, contributing significantly to EHRA’s honorable recognition at the PRISM Awards.
The Moon Dreams theme provided the perfect backdrop for this year's PRISM Awards ceremony. Attendees were treated to an enchanting atmosphere that seamlessly merged the wonders of the cosmos with the glitz and glamour of the evening.
The PRISM Awards celebrated this year’s accomplishments and once again reinforced the hallmark of excellence in the Houston sales and marketing community. The Houston's Best PRISM Awards 2023 concluded, leaving a trail of inspiration and aspiration, encouraging professionals to reach for the stars in their pursuit of excellence and innovation in their respective fields.
Download the Winner's Guide
See Event Photos